Beresford

SVIP Project: Beresford

Thursday, November 17, 2005


This week the cabinets, tile, sink and doors are all going in. Amazing how fast this thing is going. Posted by Picasa


boxes and boxes of tile waiting to be installed Posted by Picasa


here is some of what it will look like Posted by Picasa


tile guy is prepping everything to install the tile Posted by Picasa


upstairs bathroom Posted by Picasa


kitchen Posted by Picasa


kitchen Posted by Picasa


Wendy checking out the new cabinets just installed in the kitchen Posted by Picasa


the pocket door (background) for the formal dining room  Posted by Picasa


book shelves in formal dining room 11-17 Posted by Picasa


11-15 boys in house and very excited - inside doors are there Posted by Picasa


cans and ceiling - 11-17 Posted by Picasa


dining room 11-17 Posted by Picasa


master fireplace after sheetrock 11-5 Posted by Picasa


front house 11-5 Posted by Picasa


November 1 -  Posted by Picasa


dining room 11-1 Posted by Picasa


master bath 11-1 Posted by Picasa


upstairs hallway - 11-15 Posted by Picasa


Office 11-1 Posted by Picasa